Welcome

Welcome to my blog. I will attempt to make it much more than just a pitiful list of the relentlessly mundane minutiae of my daily existence but if you feel that I have failed try to imagine all the stuff that I haven't posted.

Monday, 2 September 2013

Second time lucky

Despite no blog postings, it has been a busy summer. I made a variety of test pieces from ideas of form and glaze that I have been developing over the last few months, mostly concerned with how best to illustrate the qualities that I am getting from the rocks that I am using. After the disappointing maiden firing of the new small kiln I was reluctant to post anything until I knew the results - partly just going with the flow of concentrated effort and partly superstition.
By mid August everything was made (and often broken up and remade), the wood was good and dry....
...rocks were crushed and milled and blended. I packed the little kiln last weekend and started the firing on Wednesday morning at 7.45am.
This time I was much more gentle with the move from hearth to hobs and managed to escape the cracking that occurred last time. It is only a short kiln so the distance between the initial fire and stack is not great.
Once the fire was fully inside the temperature really wanted to shoot up so I took it very slowly over the last 100 degrees to 1000C. I took a look at the weather vane and the wind had changed direction - blowing directly into the village! Dammit! Gritting my teeth I started heavy reduction but to my amazement, as the kiln is short, the chimney had heated up well in that last soak + with the air being drawn in through the passive damper in the chimney base, there was very little smoke. It wasn't very long before flame was shooting out of the top of the chimney. No matter how hard I stoked the blowhole failed to show any flame so I blocked it off + had to rely on the flame (and view inside the chamber) to assess reduction.
The rest of the firing seemed to go well - taking 19 1/2 hours in total to reach cone 12 almost down. A nice clean clam up, no late reduction, and I left it to cool.
By Sunday morning the temp was around 60C so, heart in mouth, opened up.
It was a test firing and at laest half of the pieces that I made did not survive the firing process or the unpacking, however....I got some real stunners out.
This is one of the best - glaze from Galloway rocks
There was a fair temperature variation in the kiln, but this is something that I can exploit. The top shelf didn't get that much ash but for a 19 hour firing I managed to get some wonderful rich surfaces.
This is based on igneous rock from the Malvern Hills - the oldest rock in England.



Monday, 8 July 2013

Peer pressie

I've just returned from Art In Clay at Hatfield after a fantastic show. Not only was it blindingly hot with cloudless skies and long pleasant summer evenings but I was presented with my prize for winning the Peers Award.
The man in the hat,  presenting my prize is Alan Ault from Valentines Clays, who sponsor the Award and the pot in my hand is a beautiful lidded jar made by Fleen Doran, who was apprenticed and works with Micki Schloessingk. Wood fired salt-glaze..
It was also good to meet so many people who read this blog + thus reassure me that I am not just posting into the void.

Tuesday, 25 June 2013

The maiden firing approaches....

Well....here it is! My lovely little new kiln. Finished and ready to go.

Today I biscuit fired all the work that will go through its first firing. A bit of a stressful bisque really - and very slow. There's a real range of clays in there, from smectitic Fen clays (like the Buttery clay), high silica Leicestershire glacial clays and Malvern Carboniferous era ball clays. Some of these are carbonaceous too, but the most problematic is the green clay. It's very fine, beautifully plastic, but not sticky, but very prone to bloating in the bisque as the sulphur that is bonded to its iron content burns out. It is already dense at 1000C so I did a long soak at 700 - 800C in strong oxidation. Fingers crossed.
Packing Thursday, firing Friday.

Saturday, 8 June 2013

Arch and sticky sticky clays

The cloudless skies have re-energised me and I've got loads done this week. the kiln is really taking shape - chimney finished (8ft from chimney floor, which seems short but it's a small kiln) and the arch is in place.

Still quite a bit of cutting to do to fill in the side wall of the chamber, then cover with secondary insulation + finish the firebox roof. Next week I'll measure up for all the metalwork.








Alongside this I've been working with many of the non-stoneware clays that I have collected, including local Fen clays, for an 1150C firing in the new kiln. I have managed to use some successfully, with homemade grog additions, but there's been a lot of cracking going on, with a very late sudden shrinkage that indicates highly plastic smectite clay minerals. My reading confirms that this is often the case with these Fenland clays, making them very difficult to work with. I have found one seam of sandy clay that is quite useable as it is (fantastic!) but only have a small sample of it + the area I got it from has now been quarried out.
This will give an idea of some of the new forms I am making - made from a boulder clay collected at Beacon Hill National Park in Leicestershire.

Thursday, 6 June 2013

The pit is opened

It took a couple of days to burn through, but today we opened + unpacked the Pit. Not bad for a first attempt with some good pinks and yellows from the seaweed and some colour from copper and soda, as well as the balcks.
I spent the rest of the day on the new wood kiiln. It now has a sturdy shelter (seemingly pointless in this fantastic sunshine) and only 2 more feet to add to the chimney. Arch tomorrow, along with crushing Triassic sandstone to add to my very fine Carboniferous ball clays from the Malvern Hills. More on this and my new work later.....

Monday, 3 June 2013

Sun, sawdust and the Pit

Almost eight months after first planning to do this, instead of rain the sun was shining beautifully and everyone from my morning Throwing Classes turned up with assorted bags of sawdust, straw, bicarbonate of soda and dried seaweed for the now legendary Pit Firing.
It's been dug into the ground, lined with old and now unusable kiln shelves from my dismantled salt kiln and built up with bricks. If we get enough temperature I'm hoping the kiln shelves might fume + add to the flashing?




It was filled up to the top of the kiln shelves, covered with sawdust and woodchip + then a raging bonfire built up on top to get a good bed of hot embers.
Then it was covered with corrugated iron + left to burn through. It's nearly 6pm now + still very hot + smouldering.

Monday, 27 May 2013

The sun is shining and everything is beautiful

Yes, it's glorious to feel the sun on my pallid skin at last and spend some time outdoors, taking a break from blunging, sieving and stiffening various lower temperature clays that I have collected. I've started making from them but am reluctant to post images until the ideas have coalesced and a firing is imminent.
All my bricks are now trolleyed up the field to my kiln site and I've been able to take the corrugated iron off my kiln base and get working on it.

The three sections of the kiln are now visible - firebox, chamber and chimney. The most difficult thing has been allowing for the discrepancy in sizes of all the bricks I have been using. The base was made up predominantly of previously used 25mm thick heavies (that I got cheap about 10 years ago). It turns out they are shorter than 23mm in length, not by much but enough to cause a slight overhang with my lovely new clean bricks. The chimney section is all being built from other second hand heavies that are pretty variable too.



This image shows the firebox section interior, with hobs and a grate in the floor. All the new clean crisp edged bricks are now being laid dry (without mortar).

...and this is the chamber. On the right you can see the large open throat (with central pillar) towards the firebox, and to the left a chequered flue system to the base of the chimney.
More tomorrow, including making the arch former. The arch an side wall are 26 grade insulating bricks. Once I get that and the firebox finished I will measure up for the metalwork.....oh yes, and the roof.